Every court is different, depending on the earthworks required, positioning and type of court surface required. Having a solid foundation is the start to achieving the best results. The addition of regular maintenance for your court, ensures it will play better and last longer.
New Synthetic Tennis Court
Our turnkey courts are fully inclusive of:
Earthworks
Road Base
19mm Synthetic Turf
4 x LED Spotlights atop 7.2m poles
3 metre high black PVC mesh fence
Synthetic Turf Sand
Removable net posts with internal winder and net
Please enquire below for pricing
How long does it take to build a new court?
Our professional and highly experienced team can build your new court, from start to finish, in approx. 2 weeks (weather permitting).
* Price is based on standard earthworks and court size of 32m x 16.5m. Long distance freight, travel and accommodation not included.
Upgrade to Acrylic Surface Court
Any hard court surface, whether it be concrete, asphalt or bitumen, can be upgraded to a hard wearing and dynamic acrylic playing surface.
Upgrade options may include any of the following:
Earthworks (for new courts)
Concrete or asphalt foundation (for new courts)
Repair and level existing court surface
Acrylic Surface over your existing concrete, bitumen or asphalt court
4 x energy-efficient 500/600w LED lights wired to base of each 8m black RHS pole